Tasks and team / SAPP BLOG

A task is Pending Review in Bitrix24 — what to do

What the Pending Review status means in Bitrix24 tasks. Result verification by the task creator, acceptance, returning work for revision, and reviewing the approval queue.

Read the guide
Illustration for “A task is Pending review in Bitrix24: what to do”
Result delivered · Criteria checkAcceptance or revision · Work continues
Article contents

Before you start the review

Pending review means the task awaits acceptance by its creator and does not, by itself, prove the assignee is late. Check the result; if returning it, state the specific issue and the expected correction.

Review logic
  1. 01Result delivered
  2. 02Criteria check
  3. 03Acceptance or revision
  4. 04Work continues

From completion to acceptance

When Pending review appears

This status does not appear on every task. It is linked to the option to review the result after completion being enabled.

When the assignee finishes the work, the task is passed to its creator for review. The creator receives a notification and chooses the next action: accept the result or return the task for revision.

Step 1Task in progress

The assignee prepares the result according to known criteria.

Step 2Pending review

The work has been handed over to the task creator but has not yet been accepted.

Step 3Decision

The result is accepted or returned to the assignee.

✓Accept — the task is completed
↩Return — the task is back in progress

According to the official help, the web version setting is called “Review task upon completion”. Read the Bitrix24 instructions.

Work performed is not yet an accepted result

Why this task cannot be counted as closed

The assignee may have finished their part, but the next step belongs to the creator. Until acceptance, it is unclear whether the result meets the criteria and whether dependent actions can start.

01The result is not confirmed

The document, configuration or design has not yet been checked against the completion criteria.

02The process may be blocked

The next participant is waiting for a decision and does not know whether work can continue.

03The report total will be distorted

If unaccepted tasks are included among closed ones, the completion count will exceed the actual result.

The SAPP24 app shows Pending review separately and does not count these tasks as closed. This reveals both the assignees' work and the queue of decisions awaiting the manager.

Look for the cause of the queue, not someone to blame

How acceptance becomes a bottleneck

The queue grows when reviews have no deadline, the creator is overloaded, or result criteria become clear only after completion. Employees have formally finished their work, but the project cannot move forward.

Bottleneck signals

  • 01
    Tasks from different assignees wait a long time for one creator's decision.
  • 02
    Returns use vague wording and recur.
  • 03
    Related stages begin waiting for the result to be accepted.

What to check in the process

Person responsible

Who accepts and who substitutes for them in their absence?

Deadline

When must a decision be made on the result?

Criteria

What exactly does “done” mean for this type of task?

Evidence

Where is the material or link for review attached?

From the metric to a specific task

How to clear the queue using the report

Select a short period and the relevant employees, then open Pending review. The app lets you go from the metric to the task list to review each record in context.

How to work with the metricNo real data or personal information
PeriodEmployeesProject or groupGenerate report
Team overviewClosedPending review
OOverall view
AcceptedCompleted tasks
Open listRequire review
!
The result blocks the next stage

Review first and make a decision.

Open →
!
The completion criterion is unclear

Align expectations before formally returning the task.

Open →

This is an explanatory diagram, not an interface screenshot. The actual appearance depends on the version of Bitrix24 and the application.

First accept results that a client, deal or the next project stage depends on. Then review tasks with clear deliverables. If another expert is needed, define their role before the next iteration.

See what the report includesThe app page describes the solution's metrics, filters and limitations.

App capabilities

A clear procedure reduces the queue

Result acceptance procedure

For each recurring task type, define who makes the decision, the review deadline and the completion criteria. This is not bureaucracy if the rule helps the assignee deliver the right result the first time.

Five elements of an effective acceptance process

Procedure card
01Who accepts

The creator, an expert or a substitute appointed in advance.

02When reviewed

A clear decision deadline that reflects the result's criticality.

03What is received

A file, link, comment or other verifiable deliverable.

04Checks against

Completion criteria known before work begins.

05How to decide

Accept or return with a specific expected correction.

At meetings, discuss only overdue reviews, disputed criteria and blocking dependencies. All other acceptance should happen within tasks.

If work handover between stages needs custom configuration, see what business process automation includes.

Five questions before making a decision

Task creator's mini checklist

  1. The result is attached or accessible

    There is no need to search chats, emails and verbal agreements for the work outcome.

  2. The criteria were known in advance

    The review is based on agreed expectations, not a new requirement introduced after completion.

  3. Acceptance takes place within the agreed time

    The assignee and dependent participants know when to expect a decision.

  4. The return includes specifics

    State the discrepancy, the expected correction and, if necessary, a new deadline.

  5. After acceptance, the next step is clear

    The dependent participant receives the result and can continue the process.

Practical example

Three results are ready, but the project is stalled

The designer delivered a layout, the developer a configuration, and the lawyer a contract. All assignees finished their tasks, but the results remained pending review by different task creators and began blocking the next stages.

SignalThe queue is visible in the report

The manager opens the metric and gets a list of unaccepted tasks.

ReviewBlocking results first

Review tasks that prevent the next work from starting.

ChangeAn acceptance rule is established

For critical results, record the decision deadline and a substitute.

The app shows; the manager decides

How to use the Employee Task Report

Generate the report for the selected period, open the Pending review column and build the acceptance queue. Clicking the metric opens the task list. The app itself does not accept results, return tasks or change assignees — these actions are performed in Bitrix24.For a broader review of completions, see the article on how to view employees' completed tasks for a period.

Pending reviewOpen tasks awaiting review

Do not clear the counter at the expense of quality

Typical mistakes

Accepting for the sake of appearances

Closing a task merely for appearances hides the defect and passes the problem to the next stage.

Returning with just “redo it”

Without a specific comment, the assignee does not know what needs to change.

Blaming the assignee

After completion, the next step belongs to the creator if review is enabled.

Do not enable review where acceptance adds no value. An unnecessary stage becomes a queue itself.

Key points at a glance

Frequently asked questions

If post-completion review is enabled, the task creator receives a notification. Within the team, acceptance authority can be defined through procedures and a substitute appointed in advance.

The result has not yet been accepted. The SAPP24 app separates these tasks from closed ones because they require review.

Yes. Bitrix24 lets the creator return the result to the assignee. The comment should specify the exact discrepancy and the expected correction.

Next step

Clear the queue and get the process moving again

Open Pending review, start with blocking results and decide using clear criteria. The report then becomes a navigation tool for the manager rather than another counter.

SAPP / PRACTICE

Need help with your Bitrix24?

We will review your needs and choose a suitable tool.

Result deliveredCriteria check
Criteria checkAcceptance or revision
Acceptance or revisionWork continues