Requesting a power of attorney: agreeing on authority, validity and handover of the original
Agree the action, scope of authority and validity period before preparing the document. A completed power of attorney file does not mean that the original has been signed, handed to the representative or accounted for when authority ends.
Go to instructionsAgree the action, scope of authority and validity period before preparing the document. A completed power of attorney file does not mean that the original has been signed, handed to the representative or accounted for when authority ends.
Clarify the object and expected result
Start with a precise description of the request: a power of attorney. State who needs the result, where and when it is required and which constraints are already known. The wording must distinguish this request from a similar enquiry and allow completion to be verified without relying on a verbal agreement.
The requester is the head of department. They describe the need and expected outcome, but this does not replace verification of actual completion. To choose the appropriate workflow, use Mail at reception: handing an incoming letter to the right employee.
Separate participants’ responsibilities
Assign a responsible person at every step. The person responsible for documents checks the initial information, records handover of the work and retains the next deadline. If a contractor or another department is involved, the record must retain an internal owner.
Keep related work and dependent requests in separate records with links between them. The approach is described in Smart process relationships in Bitrix24: connecting a request with related work.
Confirm actual completion
Completion criterion: the original has been handed to the correct representative, with validity and termination of authority monitored. Compare the actual result with the original request, record deviations and confirm who accepted the outcome. If the result cannot be checked immediately, set a follow-up date and leave the record open.
Do not treat a stage change alone as evidence. The time, comment and attached file help reconstruct the work, but acceptance must establish whether the required action was actually completed.
What data to store
Representative; organisation; action; subject of authority; limits; validity period; approver; ready date; original document number; actual handover.
For each field, define its source, when it is completed and which role may change its value. Do not collect unnecessary personal information. At creation, require only the data needed to choose the workflow.
Bitrix24 smart processes support custom fields, stages and permissions. The workflow shown here is a configuration design, not a ready-made built-in service. Check the capabilities and availability in your portal.
Stages and transition criteria
| State | Confirmation |
|---|---|
| StateUnder approval | Confirmationauthority and validity checked |
| StatePrepared | Confirmationa confirmed version is ready |
| StateIssued | Confirmationrepresentative has received the original |
Proceed only when the stated basis is available. For refusal, postponement and partial completion, retain the reason, current responsible person and next deadline.
Illustrative example and acceptance
Collecting a shipment requires a representative with a limited list of authorised actions. The requester first describes the specific shipment and collection location. After signing, the custodian hands over the original against acknowledgement and records its expiry date.
This is an illustrative scenario, not a description of an implementation or a promise of financial benefits.
- Under approval — authority and validity checked
- Prepared — a confirmed version is ready
- Issued — the representative has received the original
Before launch, test a normal case, a change of conditions and an incomplete outcome. For configuring the workflow, you can discuss Bitrix24 support and development.
Frequently asked questions
Who should close a power of attorney request?
Closure is confirmed by someone who can check the result: the person responsible for documents. A notification from the person doing the work does not replace acceptance.
What should be done after partial completion?
Record the completed part separately, list what remains, assign a responsible person and set a new follow-up date. Do not mark the record complete without a valid basis.
Can stage transitions be automated?
Notifications and preparatory actions can be automated, but the criterion for actual completion must remain verifiable. Tool availability depends on portal settings.
Let's discuss your working scenario
Tell us which process needs configuration and what the outcome should be. We will agree on the next step and scope of work.