Acceptance of a project stage: how to confirm the result before moving on to the next job
For the stage, specify the composition of the result, the verification script, the recipient and the acceptable comments. Sending files does not in itself complete acceptance.
What problem does this order solve?
Phased acceptance is needed where further work depends on the intermediate result. It differs from closing the entire project: part of the obligations still remains in the works.
Use material to link to adjacent activities How to accept a Bitrix24 implementation: scenarios, criteria, and handover to the team.
Data for a working register
| What to record | Purpose | Testing |
|---|---|---|
| What to recordResult of stage | PurposeDefine boundary | TestingComposition agreed |
| What to recordTesting | PurposeConfirm applicability | TestingThe criterion is observable |
| What to recordDefect item | PurposeManage the modification | TestingThere is a solution and deadline |
Procedure
1. Describe the result in advance
Separate the required composition from the wishes that appeared after the start of the stage.
2. Prepare check
Agree on the example and user role for which the result should work.
3. Review the notes
Assign a correction, clarification or a separate change in scope to each item.
4. Hand over dependent work
Start the next stage according to the agreed solution, keeping the restrictions and open points.
Example solution
Hypothetical example, not a customer case study
The prototype has been accepted according to the agreed scenarios, but the integration is not ready yet. This is not a reason to declare the entire project completed.
Exceptions and automation
Verbal approval without specifying the accepted result leaves room for dispute. Choose a recording method that follows the project and contract rules.
Continuation of work related to the topic Closing a project: how to hand over deliverables, support and unresolved issues.
Route settings can be included in the project business process automation. Agree the fields, checks and integration with the accounting system before launch; the described workflow must be adapted to the company's rules.
Pre-event check
- Composition agreed.
- The criterion is observable.
- There is a solution and a deadline.
- The result is checked on the normal case and on an exception.
Frequently asked questions
Any comment blocking the stage?
This depends on pre-agreed criteria.
Who accepts?
An appointed representative with the necessary authority.
Can I continue with the limitation?
According to an explicitly recorded decision and plan of open items.