Before you start the review
Start with the standard task list and the assignee and status filters available to you. Visibility depends on your role and permissions. Team management guidelines and report interpretation are covered in the separate articles below.
- 01Permissions and structure
- 02Viewing method
- 03Period and filters
- 04Task details
Before generating the report
First check the company structure and permissions
Bitrix24 shows managers data according to the portal’s structure and access rights. If an employee is assigned to the wrong department, the manager is incorrectly designated or task permissions are limited, the summary may differ from expectations.
- Who is listed as the department manager
- Which employees belong to the relevant department
- Whether projects, groups and CRM entities are accessible
Choose the tool to suit the question
Four ways to view your team’s tasks
There is no universally best section. What matters is knowing which decision should follow the review.
Task list
Suitable for precise filtering, finding an individual task and bulk work with task records.
One-off reviewThe “Supervising” section
Provides a standard summary of subordinates and helps assess the current situation.
The team right nowStandard reports
Answer common questions about tasks and workload; the report builder helps create a custom view.
Standard analysisReady-made application
Useful when you need a predefined set of employee and period indicators in a single interface.
Regular monitoringFor a detailed overview of the summary’s contents, read the article “Employee Task Report in Bitrix24”.
The cost of manual review
Why manual review scales poorly
When the team is small, a manager can open everyone’s tasks and keep the overall picture in mind. As the department grows, the number of combinations increases: periods, roles, projects, deals and statuses.
Repeat the navigation for every participant.
Keep the review criteria consistent.
Keep track of tasks awaiting review and repeated overdue events.
Make sure the selection is generated in the same way.
The manager starts spending time gathering the raw data rather than making decisions. A regular report standardizes the question and makes comparisons repeatable.
One interval — one question
How to generate a summary for a selected period
Choose a period that matches your management cycle. Then select employees and, if needed, narrow the selection to a project, group or CRM area.
What needs attention right now.
Which deviations appeared during the work cycle.
Where a problem has become systemic rather than isolated.
- Employees
- Projects and workgroups
- Deals and pipelines
- Leads
- Smart processes
Once the report is generated, do not start with the total task count. First look at overdue tasks, recurring events, items awaiting review and deadline changes.
Do not check everything indiscriminately
How to work only with exceptions
Click an indicator in the employee’s row to open the generated list. For each task, answer four questions in order.
Check the task description and completion criterion.
Distinguish an execution problem from a dependency or an incorrectly defined task.
The next action may be required from the manager, task creator or another participant.
Record the agreement in the task itself.
This approach turns the report into a navigation tool while preserving employee autonomy: normal work does not require constant intervention.
From question to task details
The manager’s route to the task list
- Define the question
Deadline, acceptance, workload, project or CRM area.
- Narrow the selection
Choose the smallest period and employee selection that can answer the question.
- Open the required indicator
Do not review every part of the summary in equal depth.
- Check the task details
Clarify the cause and record decisions in the tasks themselves.
- Add complexity only when necessary
If the required analysis is unavailable, move to the report builder or BI instead of maintaining a manual spreadsheet forever.
Finding the common cause
Practical example
A project office manager wants to review the participants in one launch, rather than the entire company. Instead of opening profiles one by one, they select the project, employees and week. The summary shows overdue tasks assigned to different people; opening the task details reveals a shared dependency — a delayed approval.
Regular analysis without repeated setup
How to use the Employee Task Report application
Set the required period and employees. The indicators in the team’s rows replace repeated manual setup, and clicking a number opens the corresponding tasks.
Check the report’s contents before installingReview the application’s indicators, filters and limitations on its SAPP24 page.
App capabilitiesFirst check the selection criteria
Typical mistakes
A broad selection takes longer to generate and does less to explain a specific problem.
First check the structure, permissions and correct links to projects and CRM.
Do not create a second tracking system if the decision can be recorded inside Bitrix24.
Common situations in brief
Frequently asked questions
First check the company structure, the manager’s role, task permissions and access to the selected projects or CRM entities.
The application lists a period filter among its features. To interpret results correctly, use identical intervals when comparing them.
It may be enough for a standard scenario. The application is useful when you need a consistent set of specific indicators and links to task lists.
Conclusion
Choose a method to suit the management action
Use the task list for an individual task, “Supervising” for a standard review of subordinates, and a ready-made report for repeatable period-based analysis. Numbers are useful when they lead to checking a specific task and recording a decision in Bitrix24.
Review your team for the required period
Start with a small department, choose one management question and open only tasks with deviations.
The application reports on the data already in your Bitrix24. The result depends on the accuracy of the structure, permissions, deadlines, statuses and task relationships.