Back to the blog
SAPP Blog

An online store in Bitrix24: from the catalog to the first order

We examine a store launch project: structure, products, checkout and checking the CRM connection.

What to prepare before using the builder

Define the product range, categories, prices, stock levels and delivery method. The catalog should include units of measurement, clear attributes and a person responsible for updates.

Decide which pipeline receives the order and who handles the first contact. An attractive website without an order-handling process creates more lost inquiries.

For the next step, use a separate instruction: Products in Bitrix24: configuring the catalogue and deal line items.

How to build the store

Choose a template and configure blocks, the catalog and product records. Define the button action: add to cart or proceed to purchase.

Check required fields and consent texts. If payment is used, agree on the provider, statuses and error handling.

For the next step, use a separate instruction: Payment links from Bitrix24 deals: preparation and status monitoring.

How to conduct acceptance testing

In preview mode, go through the catalog, product record, cart and checkout. Do not submit a test request on the live site without a separate safe mode.

After publication, monitor an actual order, stock levels and the CRM record under the agreed scenario. A mismatch between the storefront and warehouse needs an owner rather than manual corrections in several places.

Procedure

  1. Prepare the catalog and responsible people.
  2. Define the order pipeline.
  3. Configure blocks, product records and the cart.
  4. Test the journey in preview mode.
  5. Publish and monitor actual statuses.

What to check at each stage

Stage or situationCheck and action
Stage or situationAn out-of-stock productCheck and actionDefine visibility and sales rules.
Stage or situationThe price differsCheck and actionCheck the catalog source.
Stage or situationAn order was created without a responsible personCheck and actionCorrect assignment in the CRM.
Stage or situationPayment is not confirmedCheck and actionDo not manually mark an order as paid without verification.
  1. 01
    Catalog
  2. 02
    Storefront
  3. 03
    Order
  4. 04
    CRM
Catalog → Storefront → Order → CRM.

An illustrative example and constraints

Illustrative example: a company launches 30 products. Preview testing reveals that the size variant is not passed to the order. The product records are corrected before publication; the process owner then checks the first real order and stock movement.

Features, payment methods and Marketplace terms depend on current plans and region. Qualified specialists should review legal texts and cash-register procedures.

If you need to review settings and agree on changes to your portal, see the service Bitrix24 support and development. Provide the scenario description, expected result and discrepancy found.

Results checklist

  • The catalog is ready.
  • The pipeline is defined.
  • Consent texts have been checked.
  • Preview testing has been completed.
  • A person responsible for orders has been assigned.

Frequently asked questions

Will the order reach the CRM?

The store is connected to CRM, but the specific pipeline and processing need to be checked.

Can payment be tested in live mode?

Use the supported safe testing scenario and do not create fake transactions.

Who updates stock levels?

The assigned catalog or integration owner.

What should be checked after publication?

The order record, responsible person, product items and payment status.

Let us discuss your work scenario

Tell us what needs to be configured in Bitrix24 and which result the team needs. We will define the next step and scope of work.

Describe the situation, expected result and checks already performed. Do not include passwords or access keys.