Site readiness for installation: what to confirm before the crew leaves
How to collect confirmations from the customer and contractor, distinguish preliminary readiness from permission to travel and record changes after the check.
Site readiness must be verifiable
The crew may arrive on time but be unable to start because access is closed, the area is unprepared or required items are missing. To distinguish these causes from a contractor delay, set a checkpoint before confirming departure.
The responsible project or technical team prepares conditions for the specific installation type. A universal checklist does not replace project requirements or mandatory safety rules. The workflow records confirmations, comments and the authorized person's decision.
The related article Field service automation: planning, route and assignee's report covers a related stage. Here we consider a separate task: authorizing departure for an installation order after checking the conditions.
Once the site is prepared, keep track of the versions of documents handed to the customer. The next stage is covered in the article Handing over technical documentation to a customer: the document set, versions and receipt.
Data for a working register
| What to record | Purpose | Monitoring |
|---|---|---|
| What to recordSite and task version | PurposeCheck the correct site and scope | MonitoringThe address and current specification match |
| What to recordStart conditions | PurposeKeep track of dependencies | MonitoringEvery item has a person providing confirmation |
| What to recordConfirmation and validity period | PurposeDo not rely on an old photo | MonitoringThe date, source and limitations of the check are recorded |
| What to recordDeparture decision | PurposeSeparate data collection from authorization | MonitoringThe decision-maker and remaining conditions are recorded |
Procedure
1. Define conditions for starting work
Agree on a list with the technical lead: site access, area readiness, availability of the required materials and equipment, and participation by the parties' representatives. Define sufficient evidence and who may accept it for each item.
2. Collect confirmations in advance
The customer's representative provides information for their area of responsibility; the contractor checks the required set and work plan. Do not mark overall readiness while even one mandatory item remains unconfirmed. Conditional readiness must be visible separately.
3. Review outstanding constraints
For each comment, define an action, owner and review date. If a condition will not be met before departure, the assigned manager decides on postponement, a scope change or another agreed option. Do not turn uncertainty into silent permission.
4. Record the decision and check for changes
After the decision, retain the version of confirmations and give the crew the current plan. If the address, scope or access conditions change, recheck affected items. On arrival, the crew follows its established inspection and authorization procedure.
Example of a practical solution
Hypothetical example, not a customer case study
For an equipment installation, the customer confirms access and a cleared area, but the fastener kit is still in transit. The record shows two met conditions and one open item. The manager does not confirm departure based solely on photographs of the room.
When the required set is accepted, the owner updates the confirmation and the manager decides based on current conditions. If the customer then changes the access time, the departure decision is reviewed. The example describes coordination, not technical clearance.
Exceptions and automation
For several installation stages, create stage-specific checkpoints. Readiness of the first area must not automatically mean the whole site is ready.
If information conflicts, assign a check and retain both sources. The latest chat message is not always a confirmed decision by the site owner.
In Bitrix24, a Smart Process allows records with custom fields and stages. Availability depends on the plan. The workflow described here is a set of project requirements, not a ready-made feature that appears without configuration. Exchanges with other systems and special checks are designed separately.
Implementation can begin with business process automation. Before configuring the system, it is useful to compare the rules with the article Delayed material deliveries: how to reschedule dependent work and preserve commitments.
Pre-event check
- The technical owner has approved the condition list
- Every mandatory condition has confirmation
- Constraints and conditional readiness are shown separately
- Changes after a decision trigger another check
Frequently asked questions
Who confirms readiness?
Each participant confirms their own area, while a person authorized in advance makes the final decision. These may be different people.
Are photographs enough?
Only for items where that verification method has been agreed. Some conditions require documents, inspection or confirmation from a responsible specialist.
Must the entire checklist be repeated after a change?
Review affected conditions and the final decision. Retain the earlier confirmation history so the information used for that decision remains clear.